Skip to main content

Table 2 Agreement between measured and estimated serum creatinine in community children

From: Methods to estimate baseline creatinine and define acute kidney injury in lean Ugandan children with severe malaria: a prospective cohort study

 

Measured

Estimated

bSCr back-calculated from GFR

bSCr estimated directly

SCr

bSCrGFRSchwartz120

(reference)

bSCrGFRPottel120

bSCrGFRSchwartz137

bSCrupperlimit

bSCrheightCC

bSCrageCC

Mean (SD) (mg/dL)

0.29 (0.08)

0.31 (0.05)

0.29 (0.05)

0.28 (0.04)

0.40 (0.06)

0.29 (0.04)

0.29 (0.04)

Median (IQR) (mg/dL)

0.28 (0.23, 0.33)

0.31 (0.28, 0.34)

0.28 (0.26, 0.30)

0.27 (0.25, 0.30)

0.39 (0.35, 0.42)

0.28 (0.26, 0.31)

0.28 (0.26, 0.30)

Wilcoxona

–

***

NS

NS

***

NS

NS

Min, max (mg/dL)

0.19, 0.56

0.23, 0.34

0.22, 0.48

0.20, 0.44

0.35, 0.71

0.22, 0.44

0.23, 0.46

Correlation, SCr (r)

–

0.495

0.485

0.495

0.407

0.495

0.485

Bias (mg/dL)

–

0.025***

−0.002 (NS)

−0.014***

0.11***

−0.002 (NS)

−0.002 (NS)

Precision (mg/dL)

–

0.07

0.07

0.07

0.08

0.07

0.07

Accuracy

 P10, %

–

24%

35%

33%

8%

29%

35%

 P30, %

–

71%

79%

82%

33%

80%

78%

Proportional Bias

–

−0.66 ± 0.06 ***

− 0.70 ± 0.06***

−0.81 ± 0.06***

−0.35 ± 0.07***

−0.91 ± 0.06***

−0.88 ± 0.06***

  1. Standard deviation (SD), IQR: Inter-quartile range, r: Spearman’s rho, NS: Not significant, *p < 0.05, **p < 0.001, *** p < 0.0001
  2. aWilcoxon signed rank test (paired) for comparison of entire distribution with measured creatinine
  3. Bias: mean difference between estimated and measured creatinine. To estimate fixed bias, we compared value of the difference to a value of 0 using a one sample t-test
  4. Precision: one standard deviation of the Bias
  5. Proportional bias: the slope of the regression line of the differences between estimated and measured creatinine against the average of estimated and measured creatinine. A slope of 0 means no proportional bias
  6. Accuracy reflects the percentage of estimated SCr within 10 or 30% of the measured SCr, where accuracy = [(measured SCr- estimated SCr)/measured SCr] *100
  7. P value is the significance of the deviation of the slope from 0. ***p < 0.0001